How the NewClick system works

NewClick is a hidden fixing system for composite facade cladding. The slats click onto horizontal aluminium rails with pre-mounted clips. No pre-drilling, no visible screws, no special tools.

Three components, one system

1. Aluminium rail system

15 mm aluminium rails with plastic clips pre-mounted at fixed centres, screwed to the substructure. Horizontal for vertical slats, vertical for horizontal slats. The rail sets the spacing, not the slat.

2. Composite cladding

Co-extruded wood-plastic composite, 2900 mm long. Hook the knife edge behind the clip, lever it on and it clicks in one movement. Available as Rhombus, Barcode and Swedish Rebate.

3. Finishing profiles

Aluminium and composite start, end, corner and drainage profiles, with stainless steel stoppers, end clips and colour screws. See all finishing trims.

Black aluminium rail with pre-mounted clips, seen from the front
Aluminium rail with clips (AL-08).
The NewClick installation tool in use
The installation tool: lever the slat home.
Six horizontal aluminium rails with clips screwed to a concrete wall
Rails on the wall, clips already in place.
Universal composite corner and end profile SC09
Universal corner and end profile (SC09).

Installation in short

One installer, standard tools, from bottom to top. Pick a stage to see the steps. The full manual covers every detail that matters for the warranty.

  1. Six horizontal aluminium rails with clips on a wall

    1Mount the rails

    Level the rails with a laser or spirit level. Maximum centres 548 mm for a 2900 mm slat. Screw each rail directly to the wall, to timber frame or to battens, about every 35 cm. The rails double as ventilation battens.

  2. Two aluminium rails joined end to end with continuous clips

    2Join the next rail

    If the facade is longer than one rail, slide the clips of both rails into each other so the clip spacing continues. Do not let all rail joints fall in the same place.

  3. Stopper positioned in the rail between the clips

    3Place the stopper first

    Behind every slat goes one stainless steel stopper, spread alternately over the three middle rails. It bites the slat onto the clips so it cannot sink. Without stoppers the warranty lapses.

  1. Slat hooked at an angle behind the clips on the rail

    4Hook in the knife edge

    Hold the slat at an angle and hook the knife edge behind the clips first. Check that the first row of clips is exactly vertical so the first slat fits.

  2. Mounting tool levering a slat onto the clips

    5Click it on with the tool

    Hook the mounting tool into the cut-out of the plastic clip and lever the slat against the clips in one movement.

  3. Rubber mallet tapping a slat onto the rail

    6Hard to reach? Use a mallet

    If you cannot reach well with the tool, tap the slat on at an angle with a rubber mallet.

  4. First slats clicked onto five rails on a wall

    7Beam and helper screws

    Rest the slats on a support beam of at least 30 mm for equal height and 30 to 50 mm ground clearance. Once the first two slats sit on both sides of the rails, remove the helper screws with a 2.5 mm hex key so the clips can move with expansion.

  1. End clip holding a cut composite slat on the rail

    8Cut slats: end clip

    The last slat usually needs cutting to width. Screw an end clip to the end of each rail and clamp the cut slat behind it. Always leave at least 3 mm for expansion.

  2. Slat facade meeting a window opening with a finishing profile

    9Openings

    Around windows and at the end of a facade, finish with an aluminium or composite finishing profile.

  3. Section above a window with the drainage profile and slat

    10Above an opening

    Option 1: aluminium start, end and top profile covering the cut ends. Option 2: a composite finishing board in the reveal plus an aluminium drainage profile. Cut ends must never stay wet.

  4. Section of two slats stacked with an aluminium drainage profile between them

    11Stacking slats

    Higher than one slat length? Mount an aluminium joining profile on the seam. It covers the top of the lower slats and drains water away. Leave a small gap for expansion.

  1. Two slat facades meeting at an outside corner

    12Corners

    The universal profile serves outside corners and facade ends. Screw the aluminium corner trim to the rails first, click the profile over it and fix it with a short screw.

  2. Close-up of the slats meeting at a corner with free space behind

    13Corner detail

    Cut the trims to about 25 cm and mount them together with the rails to test that everything fits. Keep at least 3 mm of free space around corners and window frames.

  3. Mounting tool next to the universal end profile at the facade edge

    14Universal end profile

    The same profile finishes the end of a facade. Click it over the aluminium trim after the last slat is on.

  4. Slat cladding cut along a sloped roof edge on a gable wall

    15Sloped gable

    Fill the slope with empty rails without clips. Click slats on as far as possible, cut them along the roof edge and screw the cut ends to the empty rails with colour screws (one per rail, not too tight). Cover the cut ends with a roof trim.

Missing a document? Contact us.

Technical specifications

Figures per profile are on the Products page. Rows marked “on request” are confirmed on the datasheet.

Slat materialWood-plastic composite with co-extruded protective cap
RailAluminium, 15 mm, clips pre-mounted. Horizontal rails for vertical slats; rails can also run vertical for horizontal slats (always the case with Swedish Rebate)
StopperSerrated stainless steel, prevents the slat from lowering, minimum 1 per slat
Slat length2900 mm
Total system build-up37 mm (Barcode) to 41.6 mm (Rhombus, Swedish Rebate), excluding substructure
WeightOn request
Fire classOn request
Thermal expansionOn request
Rail centresMaximum 548 mm
Ground clearance30 to 50 mm, on a support beam of at least 30 mm
Mounting directionVertical slats standard; horizontal slats possible when every clip is screwed, rails then run vertically
Warranty15 years

Why click beats screw mounting

NewClick click systemScrew-mounted cladding
Fasteners in viewNone. Cleaner facade.A screw head on every slat
Pre-drillingNot neededEvery slat
InstallersOne personTwo, one to hold the slat
SpeedAbout twice as fastStandard
Weak spotsNo holes in the slat, no water ingress pointsScrew holes in every slat
Replacing a slatUnclick the one slatUnscrew a large part of the facade
StraightnessRail sets the centres; tolerances do not stackEach slat adds its own tolerance